Lake Charles, La. – The Louisiana Department of Transportation and Development (DOTD) will implement alternating lane closures on eastbound and westbound LA 14 between the LA 397/Ward Line roundabout and Gerstner Memorial Boulevard. The project, which begins Monday, March 9, 2026, and runs through Saturday, August 1, 2026, is intended to allow crews to perform pavement patching and drainage work.
Schedule and Restrictions
Closures will be in effect Monday through Friday from 7 a.m. to 5 p.m. A 10‑foot width restriction will apply for the entire duration of the project, limiting the usable roadway width for passing vehicles. Traffic in both directions will be maintained by flagging operations, a method in which trained flaggers direct drivers around the work zone to ensure safety.
Impact on Drivers
Drivers traveling on LA 14 should expect alternating one‑lane closures, meaning that only one lane in each direction will be open at any given time. The flagging system is designed to keep traffic moving, but drivers may experience slower travel times, especially during peak morning and afternoon periods. The DOTD advises motorists to allow extra time for their trips and to follow the instructions of flaggers and posted signs.
Safety Measures
Flaggers will be positioned at each end of the work zone and at strategic points along the route to manage traffic flow. The 10‑foot width restriction ensures that vehicles have sufficient clearance when passing the work area. The DOTD has emphasized that the temporary measures are in place to protect both workers and motorists.
Conclusion
The six‑month lane closure on LA 14 represents a coordinated effort by the Louisiana Department of Transportation and Development to repair critical roadway infrastructure while maintaining traffic safety through flagging operations and a clear width restriction. Motorists are encouraged to plan ahead, stay alert to flagger instructions, and consider alternate routes when possible.
